Production — Overview

The Production module takes a confirmed sales order and walks it through manufacturing: job creation, material issue, shop-floor work, quality control, and dispatch — with an AI planner advising which job to build first.

Who can use Production

Production Engineer and Company Admin. Production Engineers land on the Production Dashboard at login.

The make-to-order journey​

Sales Order (with BOM)
│
├─ Material Availability check ──▶ shortage? ──▶ Purchase Requisition
│
▼
Production Job (JOB-2026-0001) — status: Planned
│ · 5 work orders auto-created (Fabrication, Assembly, Wiring, Testing, Quality Check)
│ · BOM materials reserved in stock
▼
Issue Materials ──▶ Material Issued
▼
Shop Floor / Kanban: In Progress → Assembly → Wiring → Testing
▼
Quality Checklist ── pass ──▶ Ready for Dispatch
│ fail ──▶ QC Failed → Rework → back to In Progress
▼
Dispatch (DN-2026-0001): Packed → Dispatched → Delivered
│ · stock leaves the warehouse, sales order → Shipped, job → Completed
▼
Create Invoice (delivery-based billing)

The screens at a glance​

ScreenWhat it's for
Production DashboardMorning view — active jobs, kanban snapshot, low stock, open work orders.
Work OrdersEvery operation of every job — start, complete, log hours.
Shop FloorA live stopwatch board for operators — start/pause/finish timers.
Manufacturing JobsThe master job list — create jobs, issue materials, print job cards.
KanbanGuided stage board — advance jobs one step at a time.
Production PlannerAI ranks open jobs into the best build order.
Material AvailabilityCheck stock readiness for a sales order's BOM; raise requisitions for shortages.
Quality ChecklistPre-dispatch QC — pass moves the job to Ready for Dispatch.
DispatchDelivery notes, transport details, and invoicing from dispatch.

Job statuses and progress​

Jobs move through: Planned → Material Issued → In Progress → Assembly → Wiring → Testing → (QC) → Ready for Dispatch → Completed, with QC Failed and Cancelled as side exits. The progress bar you see everywhere is derived from the stage (Planned 5% … Testing 80% … Completed 100%).

Three things worth knowing before you start​

  1. Only sales orders with a linked BOM can be planned for production. Create the BOM first (BOM Generator), attach it to the quotation/order, and both the "From Sales Order" job dialog and the material check will work.
  2. Available stock = On Hand − Reserved. Creating a job reserves its BOM materials, so the same stock is never promised to two jobs.
  3. Dispatch is what completes a job. Marking a delivery "Dispatched" moves stock out, sets the sales order to Shipped, and completes the job — you don't need to (and shouldn't) complete it by hand first.